Stages of construction
Planning and Design
The stadium was designed by Francesc Mitjans Miró and Josep Soteras Mauri, and construction began in 1955. The stadium was originally designed to have a capacity of 93,054, but this was later increased to 99,354.
Construction
Construction of the stadium was completed in 1957. The stadium was built in a horseshoe-shaped design with tiered seating, originally without a full roof, only a partial cover over the Main Stand. The exterior was made of white concrete.
Expansion
In 1980, the stadium was expanded to accommodate the 1982 FIFA World Cup. A third tier of seating was added, and the capacity of the stadium was increased to 120,000.
Renovation
The stadium is currently undergoing a major renovation expected to complete in 2027. Work includes the demolition and rebuilding of the third tier, a new full-coverage roof, modernization of all facilities, and an eventual capacity of over 105,000.